PUBLIC CONSULTATION · REETS FARM CLOSE, NW9 7HW
New bungalows at Reets Farm Close
Have your say on proposals to replace the garages at Reets Farm Close with three new one-bedroom bungalow.
ZED PODS and the London Borough of Barnet want to hear from local residents before a planning application is submitted. Join our online meeting, or read the proposals here and leave your feedback.

3
new bungalows
1
bedrooms in each home
1
storey high
3
parking spaces with EV charging facilities
ABOUT THIS CONSULTATION
Help shape the plans before they go to planning
ZED PODS is working with the London Borough of Barnet to prepare a planning application for the garage site at Reets Farm Close. The scheme would replace the existing garages with three energy-efficient, single-storey one-bedroom bungalows, built offsite using modular construction to reduce disruption to neighbours.
Their low height keeps them in scale with the neighbouring bungalow and the surrounding gardens. Each home would have one parking space, with new landscaping and cycle storage. Before the application is submitted, we would like to share the proposals with you and hear your views.
As this is a small site, the consultation is being held as an online meeting on Microsoft Teams. If you can’t join, you can read the information on this page and leave your feedback online.
PROJECT TEAM
London Borough of Barnet
Client
ZED PODS
Principal Designer and Contractor. ZED PODS designs and builds high-quality, energy-efficient modular homes, manufactured offsite in the UK.
The site
THE SITE
A garage court at the head of Reets Farm Close
The site is a triangular plot made up of garages and hardstanding, set within an established residential area in Hendon.
Site area
Approximately 580 m².
Neighbours
The immediate neighbour at No. 19 is a single-storey brick bungalow. Beyond it, the close is lined with two-storey inter-war semi-detached and terraced houses with front hedges and mature street trees.

Local character
Pitched, hipped roofs in red-brown clay tile, brick chimney stacks, and walls in buff and red brick, often with render on the upper floors.
On the site
An electricity substation with its access sits beside the site, and a mature tree with a large canopy overhangs one edge.
Local services
Colindale local centre, Sainsbury’s, Silkbridge Retail Park, four schools and several parks, including Silver Jubilee Park and West Hendon Playing Field, are all within a 1 km walk.
Getting around
Public transport accessibility level (PTAL) 2. Five bus routes stop within a 600 m walk.

THE PROPOSALS
What we are proposing
A single-storey row of three bungalows in place of the garages, with new landscaping, cycle storage and one parking space for each home.
Homes on one level
Three one-bedroom, two-person bungalows of about 50 m² each, with all living space on a single floor.
In scale with neighbours
A low, single-storey form that sits comfortably beside the bungalow at No. 19 and the surrounding back gardens.
Landscaping and green space
New hedging and wildlife-friendly planting, with the existing vegetation enhanced with wildflowers.
Parking and access
One parking space for each home, using the existing access from Reets Farm Close. Access to the substation is kept.
Built offsite
The homes are manufactured in a UK factory and installed on site, which shortens the build and reduces noise and disruption for neighbours.
Low running costs
A fabric-first, energy-efficient design to keep bills low, with cycle storage and a communal refuse store.

Proposed site plan (indicative)
HOMES AND LAYOUT
Three new bungalows
Proposed housing mix
HOME TYPE
SIZE
HOMES
1 bed, 2 person bungalow
50 m²
3
Total
150 m²
3
The swatch colour matches the homes in the 3D massing view. Sizes are approximate internal floor areas.
Parking and cycle storage
Car parking spaces (one per home)
3
Cycle storage and a communal refuse store are provided on site. The existing vehicle access from Reets Farm Close is retained.
ONLINE CONSULTATION
Join us online
Online meeting
Date [TBC]
Time [TBC]
Where: Online, Microsoft Teams
A short presentation from the project team, followed by your questions.
How to join
No Teams account or app needed. You can join from any web browser on a computer, tablet or phone.
1
Type this address into your browser
2
Or go to teams.microsoft.com/join and enter
Meeting ID
Passcode
3
Can’t make it?
Read the proposals on this page and leave your feedback below.
What happens next
1
Pre-application discussions
The design has been reviewed with Barnet’s planning officers.
2
Public consultation (now)
We share the proposals and collect your feedback.
3
Planning application
Feedback is reviewed and the design developed before a full planning application is submitted.
4
Council decision
The Council runs its own statutory consultation, and you can comment again at that stage.
HAVE YOUR SAY