College Green
A social housing development of 2 zero operational carbon bungalows
In collaboration with Mid Devon District Council, we have designed and achieved planning approval for this groundbreaking social-rented, zero-carbon operational development. This initiative aligns with Mid Devon District Council's ambitious objective to construct new affordable housing units and introduce innovative housing solutions by revitalising underutilised areas. It strives to enhance the quality of life for current residents through enhancements to public spaces and external landscaping. This project represents a key component of the Council's comprehensive five-year plan for social housing development.
Project Information
Client: Mid Devon District Council (MDDC)
Location: College Green, Uffculme, EX15 3EH
Building Solution: Permanent
Scope of works: Full Turnkey Service (RIBA Stage 0 – 7)
Status: Planning granted
Project Team
Funding Supports
Brief
Building affordable & energy-efficient homes
Mid Devon District Council has received grant funding from the “Affordable Homes Program 2021-2026”, a £11.5 billion of capital funding over five years to enable the supply of approximately 162,000 new affordable homes. In addition, the Council has received additional funding under “Brown Field Release Fund” as part of a total award of £660k to build 50 social-rented homes at six regeneration sites across the district.
Full Turnkey
Process
This project was executed through a full turnkey Design & Build process, encompassing all stages of design according to RIBA standards, planning application, offsite manufacturing, module delivery, onsite groundworks and construction and handover.
The proposed development at Eastlands optimises the Council’s housing and parking allocation by delivering five high-quality, energy-efficient homes in configuration of 2 x 3B5P and 3 x 2B4P, each home with generous private amenity spaces.
This scheme further develops surrounding landscape by providing a communal garden and an extended footpath with better connection to existing neighbouring rear gardens. By given serious consideration of the window positions, there are no overlooking into houses located to the west. The scheme provides more formal parking for local residents whilst addressing the local housing need.
Constraints
Telegraph pole with overhanging cables running parallel to site
Existing informal & formal parking spaces
Close proximity to neighbouring property
Road width 3.7m - 4.9m
Single story bungalow units
Street character with typology mix of 1 and 2 storey dwellings
Existing garages and storage units
Opportunities
Keeping within existing rear building line
Retention of existing retaining wall
Potential for green verge to act as buffer between development and existing properties located to the rear
Potential site for building location with max. building height of 2-stories
Potential provision for parking
Provision of communal landscaping
Massing Strategy
The massing has been set back from College Green to allow for ancillary space as well as maintaining a significant distance away from large trees located within the rear gardens. As the site sits topographically higher than the surrounding units the ridge height of a one storey mass is significantly lower. The topographical advantage was considered given the lack of over-shading or overlooking concerns on site.
Set Back and Key Distance
The proposed massing has been set back from College Green to allow for parking provision towards the front of the scheme. The large distances to the windows of any surrounding buildings there is no opportunities for overlooking or privacy concerns within the proposal.
Strategic Views
Habitable room spaces have all been designed with primary windows facing towards the large tree foliage at the rear of the scheme. There are no views into either of the adjacent properties.
Accommodation Mix
The scheme proposes 1 bedroom units to serve a range of housing needs with both being accessible units. Each has a 5 sqm private amenity space provided by a rear garden with side access.
Vehicular Access
The existing site access from Eastlands will be retained for vehicle parking and pedestrian access to units. Introducing access parallel to the massing helps reconnect the site to the wider context and existing footpaths.
Pedestrian and Cycle Access
There is two new pedestrian access points proposed from Eastlands allowing for easy access for residents and allowing for multiple entry points and well as improving connectivity to existing footpaths. Cycle stores are to be located within rear garden space.
Noise and Pollution
The position of the massing increases distance between habitable spaces and Eastlands with amenity grass land, defensible planting and ancillary space creating a buffer zone. Mass acts as a screen for private garden space and habitable spaces.
Public Consultation
The public consultation took place in on 5th December 2022 at the point where the team had certainty that technical issues were resolvable and therefore there was some confidence that what was presented to the community would be a fair representation of the scheme for which planning permission might be sought in the future.
In November 2022 a mailing was sent out which explained the overall aims of the scheme and included the general massing. ZED PODS in collaboration with Mid Devon District Council have reached out to all residents within a 100 meter radius, to request feedback on the outline massing and landscape design of the proposal. We aimed to make the consultation as effective as possible by distributing a newsletter.
Public Consultation Feedback
All residents contacted during the mailing period expressed that they would not be interested in attending any meetings regarding the project.
On the evening of the online consultation a ZED PODS representative was available throughout the session, ensuring that if any residents attended we would be able to answer queries.
Construction off-site to minimise disruption and site installation
Upcoming
Building Regulations Application
Construction Phase Plan
Upcoming
Project Brief approved by the Council
Undertook Feasibility Studies
Agree on Project Budget
Prepare Project Programme
Completed
Completed
Building handed over to the Council
Upcoming
Develop Business Case
Review Project Risks
Review Project Budget
Undertook Site Appraisals
Completed
Architectural Concept approved by the Council and aligned to the Project Brief
Obtain pre-application Planning Advice
Initial Cost Plan
Completed
Planning application submitted
Completed
Residents move in
Upcoming
Project Timeline
Current Stage: RIBA Stage 4 — Technical Design